This platform produces the majority of the gas under the project. Oil/condensate and gas separation including gas treatment for transport to the LNG plant is done at the onshore processing facility. The Lun-A was successfully brought on stream in December 2008.
In order to ensure constant gas production from the LA-512st gas well, a flowline shall be installed and commissioned by January 2024. Drilling sequence to be determined by operational requirements. The LA-512st gas well flowline is planned for future as a flowline, which installation requires a Detailed Design.
Currently, the completion of project design is close to 90%.